National Aeronautics and Space Administration

Public NEPA Documents


        This repository contains NASA's final NEPA documents.


NASA Center *
Official Name
Document Title and Type
Date
Completed
Environmental Assessments
  LARC   14X22 Ft Tunnel Productivity Enhancement  
        EA 14X22 Ft Productivity Enhancement.pdf - (Final EA)   02/01/1997  
 
  LARC   Closure of Plum Tree Island Model Drop Site  
        EA Closure of Plum Tree Island 1995.pdf - (Final EA)   03/01/1995  
        FONSI Closure of Plum Tree Island.pdf - (Final FONSI)   10/29/2018  
 
  LARC   Combined Loads Test System (COLTS)  
        EA COLTS 1995.pdf - (Final EA)   06/01/1994  
        FONSI COLTS.pdf - (Final FONSI)   10/29/2018  
 
  LARC   Construction and Operation of Flight Dynamics Research Facility  
        Final SEA Master Plan 8-9-17.pdf - (Final EA)   08/01/2017  
        Final FONSI SEA Master Plan 8-8-17.pdf - (Final FONSI)   08/18/2017  
 
  LARC   Deconstruction of 13 Buildings  
        13 Bldg Demo EA 7-08.pdf - (Final EA)   07/01/2008  
        Final FONSI - Deconstruct 13 Bldgs.pdf - (Final FONSI)   08/07/2008  
 
  LARC   Deconstruction of 21 Buildings at NASA LaRC  
        Final EA COE Bldg Demo 5-18-09.pdf - (Final EA)   05/01/2009  
        Publication of FONSI.pdf - (Final FONSI)   06/21/2009  
 
  LARC   Deconstruction of LTPT Complex at NASA LaRC  
        LTPT Demo EA Final.pdf - (Final EA)   12/01/2009  
        LTPT Demo FONSI Signed.pdf - (Final FONSI)   01/19/2010  
 
  LARC   Demolition of Bldg. 1212B  
        Final 1212B EA.pdf - (Final EA)   05/01/2007  
        1212B FONSI Signed.pdf - (Final FONSI)   05/07/2007  
 
  LARC   Demolition of Fourteen Buildings at NASA LaRC  
        14 Bldg Demo EA 5-03.pdf - (Final EA)   05/01/2003  
        FINAL_FONSI.pdf - (Final FONSI)   05/15/2003  
 
  LARC   Demolition of Various Buildings and Infrastructure  
        Final EA NHL Demo LaRC.pdf - (Final EA)   06/01/2008  
        Final FONSI NHL Demo.pdf - (Final FONSI)   06/12/2008  
 
  LARC   Demolition of the Aircraft Landing Dynamics Facility Complex at NASA LaRC  
        ALDF Demo Draft EA 11-16-2011.pdf - (Final EA)   11/01/2011  
        ALDF Demo Final EA.pdf - (Final EA)   02/01/2012  
        FINAL FONSI ALDF Demo EA.pdf - (Final FONSI)   02/15/2012  
 
  LARC   EOSDIS DAAC Facility at LaRC  
        COLTS EOSDIS EA.pdf - (Final EA)   12/01/1993  
        COLTS EOSDIS FONSI.pdf - (Final FONSI)   12/13/1993  
 
  LARC   Hydro Impact Basin at LandIR  
        Final Hydro Basin EA.pdf - (Final EA)   01/01/2009  
        Final FONSI Signed.pdf - (Final FONSI)   01/25/2009  
 
  LARC   Implementation of the Master Plan at NASA Langley Research Center  
        Final Master Plan EA 6-4-13.pdf - (Final EA)   06/01/2013  
        FONSI Signed.pdf - (Final FONSI)   08/21/2013  
 
  LARC   LIDAR In-Space Technology Experiment  
        EA for LIDAR 1993.pdf - (Final EA)   12/01/1993  
        FONSI LIDAR 1993.pdf - (Final FONSI)   01/31/1994  
 
  LARC   Modifications to 14X22 Subsonic Tunnel  
        FONSI Modifications to 14X22 Tunnel.pdf - (Final EA)   04/01/1993  
        EA Modifications to 14X22 Tunnel 1993.pdf - (Final FONSI)   10/29/2018  
 
  LARC   Modifications to 16-Ft Tunnel  
        EA 16 Ft Modifications.pdf - (Final EA)   03/01/1993  
        FONSI 16 Ft Modifications.pdf - (Final FONSI)   10/29/2018  
 
  LARC   National Institute of Aerospace EA  
        NASA NIA EA 1-14-02.doc - (Final EA)   01/01/1998  
        NASA Final_ FONSI 3-1-02.doc - (Final FONSI)   01/28/2002  
 
  LARC   National Transonic Facility Productivity Enhancement  
        EA NTF Productivity Enhancement.pdf - (Final EA)   10/01/1996  
 
  LARC   New Town EA  
        New Town EA 9-08.pdf - (Final EA)   09/01/2008  
        New Town EA FONSI.pdf - (Final FONSI)   10/15/2008  
 
  LARC   New Town Geothermal Project  
        New Town SEA 4-09.pdf - (Final EA)   04/01/2009  
        LaRC New Town SEA Final FONSI Signed.pdf - (Final FONSI)   05/04/2009  
 
  LARC   Rehab B-1194 (Library)  
        Final_Library_EA.pdf - (Final EA)   03/01/2004  
        Library Mod EA FONSI 4-04.pdf - (Final FONSI)   04/01/2004  
 
  LARC   Repairs to Unitary Plan Wind Tunnel Shell  
        EA Reapirs to UPWT 1993.pdf - (Final EA)   04/01/1993  
        FONSI Repairs to UPWT.pdf - (Final FONSI)   05/04/1993  
 
  LARC   Replacement of 20 Inch Mach 6 CF4 Tunnel Heater System  
        EA Replace CF4 Tunnel Heater System.pdf - (Final EA)   05/18/1998  
 
  LARC   Sub-Tenanting Building 643 to ODU  
        EA Sub-Tenant B643 1996.pdf - (Final EA)   09/01/1996  
 
  LARC   Transonic Dynamics Tunnel Heavy Gas Replacement  
        EA TDT Heavy Gas Replacement 1995.pdf - (Final EA)   04/01/1995  
        FONSI TDT Heavy Gas Replacement.pdf - (Final FONSI)   04/26/1995  
 
  26 Projects 


* Sorted by NASA's ten centers and component facilities [see map].
Federal Register Home Page
Source: NASA Environmental Tracking System